Dominion Energy has acquired a 72-MW solar project still under construction in Beaufort county, South Carolina, from First Solar. “South Carolina, through the General Assembly and Governor McMaster, has expressed an interest in the benefits of renewable energy,” said Keller Kissam, president of electric operations at Dominion Energy. “Dominion Energy South Carolina already has 500…
The post Dominion acquires 72-MW South Carolina solar project from First Solar appeared first on Solar Power World.
Lắp đặt điện mặt trời Khải Minh Tech
https://ift.tt/2X7bF6x
0906633505
info.khaiminhtech@gmail.com
80/39 Trần Quang Diệu, Phường 14, Quận 3
Lắp đặt điện mặt trời Khải Minh Tech
https://ift.tt/2ZH4TRU
Không có nhận xét nào:
Đăng nhận xét