Thứ Năm, 22 tháng 8, 2019

TurningPoint Energy begins construction on 6.57 MW of Maryland community solar

TurningPoint Energy and ForeFront Power announced that three Maryland-based community solar projects representing 6.57 MWdc are beginning construction, and are expected to be completed by the end of 2019. These projects were awarded to and developed by TurningPoint Energy as part of Maryland’s Community Solar Pilot Program, which is focused on providing renewable energy benefits…

The post TurningPoint Energy begins construction on 6.57 MW of Maryland community solar appeared first on Solar Power World.


Lắp đặt điện mặt trời Khải Minh Tech
https://ift.tt/2X7bF6x
0906633505
info.khaiminhtech@gmail.com
80/39 Trần Quang Diệu, Phường 14, Quận 3
Lắp đặt điện mặt trời Khải Minh Tech
https://ift.tt/2ZH4TRU

Không có nhận xét nào:

Đăng nhận xét